The electricity market in Spain is in a completely monopoly situation. Neither the Spanish royal family nor the Spanish court can control the price of electricity resources, or even affect the power resource prices of OMIE/Iberia energy market operators. Pricing Strategy.

To put it simply, the Spanish court and royal family have no power to price electricity resources!

This situation leads to the fact that the price of electricity resources in the Spanish power market is completely determined by OMIE/Iberia Energy Market Operator, and OMIE pays how much it wants to sell.

Even if the Spanish court adjusts through tax measures, it will still have no effect. Because the Spanish court raises relevant taxes, OMIE can increase the price of electricity resources, thereby passing on the cost of rising taxes to the people, so that the final infamy remains. Leave it to the Spanish court.

After all, if the Spanish court had not raised taxes, how could OMIE raise the price of electricity resources?

It was also because OMIE completely monopolized the electricity market in the Spanish Peninsula that the Spanish court and royal family decided to introduce Dream Future Energy Group to combat OMIE's monopoly.

As for whether Dream Future Energy Group will become a new evil dragon after monopolizing the power market in the western half of Spain, that is a matter for the future.

Besides, Dream Future Energy Group has signed an agreement with the Spanish court to set a maximum monopoly price of 1.5 kWh per kWh, which is a little lower than the average electricity price in Spain in 2019.

Therefore, even if Dream Future Energy Group monopolizes the power market in the Spanish Peninsula, the Spanish court can accept it.

However, those are bright futures. OMIE’s current monopoly on the Spanish power market has caused huge trouble for AXA Construction to undertake the construction of the Madre IV nuclear power plant.

Based on the calculation that a construction-type guardian robot consumes 160 kilowatt-hours of electricity resources per day, OMIE’s current electricity resource price in the Spanish Peninsula is US$0.28 per kilowatt-hour, which is equivalent to each construction-type guardian robot consuming 44.8 kWh per day. U.S. dollar cost of electricity resources.

Based on today's exchange rate of 1 US dollar equal to 6.7429 Xia Guoyuan, the power resource cost of each architectural guardian robot reaches 302 Xia Guoyuan per day, which is equivalent to the power resource cost of 9060 Xia Guoyuan per month.

Calculated based on the scale of 1,000 construction-type guardian robots, the monthly power resource cost is 9.06 million Xia Guoyuan. If the construction period is 12 months, the total power resource cost expenditure will increase by 108.72 million Xia Guoyuan.

This expenditure may seem inconspicuous. After all, the Spanish imperial court provided 4 billion Xia Guoyuan in the human resources budget. Even if the cost of power resources needs to be borne by the contractor himself, it will only increase by less than 110 million Xia Guoyuan.

However, the Spanish power market is highly monopolized by OMIE. Dream Future Energy Group and OMIE are the most direct competitors. The fourth-generation nuclear power plant is completely digging OMIE's ancestral grave.

Once the fourth-generation nuclear power plant is established, it will directly overthrow OMIE's market monopoly in the corresponding region.

Under such circumstances, even if you think on your toes, you know that OMIE will definitely not support the construction of fourth-generation nuclear power plants.

If AXA Construction agrees to bear the cost of power resources itself, it will inevitably face crazy attacks from OMIE.

If we just raise the price of electricity resources, we can still use money to solve the problem.

However, Anliang suspected that OMIE would not just raise the price of power resources, but directly not provide power resources!

As long as OMIE does not provide power resources, construction-type guardian robots will not be able to invest in the large-scale construction of fourth-generation nuclear power plants.

As long as fourth-generation nuclear power plants cannot be put into use, OMIE's monopoly will continue.

In order to monopolize the Spanish power market for a longer period of time, if Anliang controls OMIE, Anliang will also refuse to provide power resources when faced with the current situation.

An Liang even suspected that OMIE was behind the push for a four-day, thirty-two-hour working week by the Spanish Parliament.

An Shengyu watched An Liang looking at his phone, and he asked casually,"Is there anything work-related?"

"Um! An Liang replied affirmatively,"During the barbecue yesterday, didn't I talk about preparing to build the fourth-generation nuclear power plant in Madrid, Spain?""

"Something happened?"An Shengyu asked

"Something happened."An Liang answered affirmatively. He first explained in detail the monopoly situation in the Spanish electricity market, and then explained the quotation information given by the Spanish court.

"If according to what you said, this project is really difficult, I will arrange for a budget person to calculate the cost later."An Shengyu explained.

An Liang refused negatively,"No need, it's easy for us to make a budget."

As for the budget issue, Anliang can even handle it through the Tianji artificial intelligence system. Although the Tianji artificial intelligence system certainly cannot be exhaustive, there is definitely no problem with a rough budget.

"From a profit perspective, even if OMIE does not provide power resources at all, we build our own power supply system and use natural gas or coal to generate electricity, we will still have enough profits."An Liang added.

This is the invisible profit brought by the high selling price of the Guardian series robots!

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like