An Liang continued to check the information sent by Song Ren. In addition to the analysis of the structure of electric energy owners in the Tyrande electric energy market, this information also included an analysis of the electric energy structure.

Xia's electricity energy structure mainly relies on coal thermal power generation, but Tyrande is different. Tyrande mainly relies on natural gas thermal power generation.

In Tyrande's power energy structure, natural gas thermal power generation accounts for about 65%, coal thermal power generation accounts for about 20%, new energy generation such as hydropower and wind power account for less than 5%, and then Imported electricity is around 10%.

Although it can be judged from the energy structure, Tyrande's electric energy seems to be basically self-sufficient. After all, imported electric energy only accounts for 10%.

However, the information given by Song Ren gave a more detailed explanation.

Take natural gas thermal power generation, the largest source in Tyrande's power energy structure, as an example.

81% of the natural gas used by Tyrande for thermal power generation is produced locally, 16% is imported and purchased from neighboring Maine, and 3% is imported liquefied natural gas (LNG).

This data ostensibly confirms the stability of Tyrande's power energy. After all, more than 80% of the natural gas is mined locally in Tyrande, which means that the source of natural gas is very stable, thus ensuring the stability of power energy.

But there are additional explanations for this data.

Since 2012, the daily output of natural gas extracted in Tyrande has exceeded 110,000 cubic meters, but it is still unable to meet Tyrande's domestic growing demand for electricity.

Tyrande's energy department even stated in 2014 that Tyrande's local natural gas reserve resources will face depletion after 2021.

It is now the end of 2020, and Tyrande's local natural gas extraction work is indeed in trouble. The Tyrande court has early negotiated with its next-door neighbor Maine to expand the scale of natural gas imports.

But none of these measures can solve the problem of Tyrande's lack of natural gas. Once the natural gas supply cannot keep up, it will cause Tyrande's power energy crisis.

Now, on the surface, the Tyrande power and energy market seems to be calm, and there seems to be no problem. But if you dig deeper under the sea level, you can find that the Tyrande power and energy market is already in crisis.

After all, there is no high-quality coal in Tyrande. Once the natural gas is exhausted, low-quality coal cannot participate in thermal power generation.

Tyrande does not have abundant hydropower resources. At present, the rivers in Tyrande that can be used for hydropower generation have been fully developed.

In addition, there is still a fresh water crisis in the eastern region of Tyrande. Where are there any hydropower stations to develop hydropower resources?

As for nuclear power...

Nuclear power was originally the best choice. Even third-generation nuclear power plants can produce large amounts of electricity.

But Tyrande does not have nuclear power. It was previously shown in Tyrande's power energy structure that Tyrande does not have nuclear power.

The reason why Tyrande does not have nuclear power is not that the Tyrande court is stupid, nor is it that the Tyrande people resist nuclear power. In fact, the Tyrande court planned a nuclear power development plan as early as 12 years ago.

The Tyrande court originally planned to build two third-generation nuclear power plants with a total power generation of 2 million kilowatts and a total annual power generation of 17.5 billion kilowatt hours. They planned to officially put them into commercial operation in 2020 and 2021, thus successfully replacing Electricity energy demand after natural gas depletion.

This kind of planning is very good, showing that the Tyrande court has considered the future and made efforts.

But the problem is that such a plan has not been implemented!

What's the use of just having a plan?

No matter how good the plan is, it needs to be implemented in order to produce the expected effects of the plan. Otherwise, it is a blank check and has no effect at all.

The Tyrande court obviously knew the necessity of nuclear power, so it restarted the nuclear power development plan two years later. It was still a plan for two nuclear power plants with a power plan of 2 million kilowatts, but the commercial operation time was postponed to 2026 and 2027, which is quite Yu Shuang postponed it for six years.

If this nuclear power development plan is finally implemented, it will still be the result of making amends before it is too late.

However, the results are still not optimistic!

This time the nuclear power development plan has still not been implemented. The plan is still just a plan and has no intention of being implemented.

Five years later, in 2015, the Tyrande court once again restarted the nuclear power development plan. The corresponding plan has not changed. It is still two nuclear power plants with a total power of 2 million kilowatts.

The only thing that has changed is that the commercial operation time has been postponed to 2035 and 2036, which is equivalent to taking 20 years to build and develop two third-generation nuclear power plants with a total power of only 2 million kilowatts.

Such a nuclear power development plan is simply outrageous!

It's all a joke, okay?

So to this day, as 2020 is coming to an end, Tyrande still has no nuclear power energy, and the nuclear power development plan is still floating above the atmosphere, with no intention of landing.

Such a situation is absolutely terrible for Tyrande, but for Anliang, such a thing is great!

Because the worse the Tyrande power energy market is, the more opportunities Dream Future Energy Group will have...

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like